1915Çanakkale Bridge’s Approach Viaducts are Rising
Manufacturing of the anchorage blocks on both sides of the 1915Çanakkale Bridge has been completed.
Construction is currently in progress on the piers of the approach viaducts, which are 680 meters high on the Lapseki shore, and 365 meters on the Gelibolu shore. As for the bridge’s piers, erection process of the 8th blocks has started, and the piers have reached a height of 84 meters.