The Asian Tower’s First Tower Block Installation Completed
The first tower block installation on the Asian caisson of the 1915Çanakkale Bridge has been completed.
The caisson forming the foundation of the 1915Çanakkale Bridge on the Asian side were immersed into place in May 2019. 1915Çanakkale Bridge’s mid-span is 2023 m long which symbolizes the 100th anniversary of the founding of the Republic. In like manner, the towers and connectors will bear the colors of the Turkish flag.